|
Features
Applications
- Fill in the spaces left by the ceramic tiles
(setting joints), promoting the water-proofing
of the coating.
- It may be used in ceramic pieces, tiles and
natural stones.
- It may be used in joints 3 to 13 mm wide.
Preparation
One must follow the packaging recommendations with respect to the amount
of water to be added. Preferably one must use
the mortar box and mechanical mixer.
Grout Applications
- Initiation: 3 days after the setting of the
ceramic coating.
- Before the application of grout mortar, the
joints must be clean, free from powder, loose
particles, mortar remains and other conditions
which might prejudice the bonding strength.
- Dampen the joints and borders of the ceramic
before filling joints, to assist the hydration
of cement. In porous ceramics, hot days or with
low relative humidity of air, dampen abundantly.
This procedure will avoid the scattering of
the product.
- The grout must be prepared in a mortar box
with mechanical mixer. The anhydrous material
must be mixed with clean water, in the proportions
shown in the packaging, obtaining a mortar without
air pockets, pasty and bonding.
- Rest time: after the preparation, the mortar
must rest for 10 minutes, so that the additives
react, and must be mixed again before using.
Working time: the use of mortar must occur over
a maximum time of 2 hours and 30 minutes after
its preparation. During this time, do not add
water or any other substance. After this time,
the mortar must be discarded.
- Apply the grout mortar with the rubber finish
trowel, executing continuous movements of to-and-from
diagonally to the joints, and the do the finish
with a plastic hose or similar, so as to obtain
an integral grout, without weak points and homogeneous
coloring.
- Leave the grout to dry for 15 to 30 minutes
and make a coating cleaning with a clean and
humid soft sponge. Finish the cleaning with
a clean and dry cloth or burlap. Do not carry
out the cleaning with excess water in the sponge,
because it might carry out a superficial washing
of the pigment, provoking stains. Never use
acids.
- On floors, the clearance for normal traffic
will occur in 7 days and for heavy traffic in
28 days.
|